Public Realm

Skainos

Client

Farrans Limited

Duration

16 Weeks

Services

Overview

We were appointed as subcontractor to provide the hard landscaping package for this ambitious urban regeneration project in East Belfast.

What We Did

Works included the extensive supply and installation of sandstone and granite; raised sleeper beds; a coloured soft play area and hardwood decking with integral anti-slip inserts. We also installed Tobermore Concrete paths and roof terraces laid on pedestals.

Key Detail

Given that this was a local regeneration initiative, we extensively used local materials, native plants and indigenous stone and turf both in construction and in reinstatement.